City of Calabasas, CA
Home Menu2023 ADA Curb Ramp & Sidewalk Replacement Project
GENERAL PROJECT INFORMATION | |
Project Title: | 2023 ADA Curb Ramp & Sidewalk Replacement Project |
Location: | Various Locations around the City. See map. |
Construction Dates: | Click here to see the dates |
Contractor: | FS Contractors Inc. |
Contact: | Anna Hartounian, ahartounian@cityofcalabasas.com |
Project Description:
The 2023 ADA CURB RAMP & SIDEWALK REPLACEMENT PROJECT includes the following:
- Remove and construct new sidewalk panels
- Trim tree roots under the panels for new replacements
- Replace and adjust concrete utility boxes/valves
- Remove and Construct ADA compliant Curb Ramps
The purpose of the project is to remove buckled or lifted sidewalk that could cause potential tripping hazard for pedestrians. The replacement sidewalk panels shall be constructed to be flush with the adjacent panels thereby eliminating any potential tripping hazard.